How the risk register works in Simson Desk

A risk register fails in one of two ways: it is a spreadsheet nobody opens between audits, or it is a list of worries with no link to anything real. The register in Simson Desk is built to avoid both.

What a risk records

  • What could happen, and to what.
  • The asset, vendor or information asset it is linked to.
  • Likelihood and impact, each on a five-point scale.
  • The treatment chosen, and the plan for it.
  • The residual rating once the treatment is in place.
  • An owner and a review date.

Linked risks have a minimum impact

When a risk is linked to an item that is rated High or Moderate, its impact cannot be set below a floor. The value of the thing at risk limits how small you can call the consequence.

Four treatments

TreatmentMeaning
MitigateReduce the likelihood or the impact with a control
TransferPass it to another party, such as an insurer or a supplier
AvoidStop the activity that creates the risk
AcceptLive with it, with management’s recorded agreement

The heat map

Risks are plotted on a five-by-five grid of likelihood against impact, so the cluster in the top-right corner is visible at a glance. It is the page a management review actually looks at.

Reviews that fall due

Each risk has a review date. Overdue reviews and risks with no residual rating are listed separately, because those are the first two things an auditor asks about.

The export

A manager can export the register as a PDF: an overview with counts and the heat map, the points a reviewer should look at, the register as a table, a detail card for each risk, the method used, and sign-off lines. Every export is logged, with who made it and when.

Who can export the risk register?
Compliance managers and administrators. Each export is recorded in the audit log.
Can a risk be linked to a vendor?
Yes — to an asset, a vendor or an information asset.
How often are risks reviewed?
Each risk carries its own review date, and overdue reviews are listed.

See SimDesk Remote Support in action

Attended & unattended, recorded and ticket-native. Free — no per-operator fees.